SUV OLIB KELUVCHI KANALNING LOYQALANISHINI KAMAYTIRISH VA NASOS STANSIYASI ISH REJIMINI YAXSHILASHNING KOMPLEKS USULI

The causes of siltation of the M-3 canal fed by the Karshi Main Canal are analysed, and a combined method based on the joint selection of canal, forebay and pumping unit parameters is proposed. At the present low discharges (7-11 m³/s) the sediment transport capacity of the canal is 30-400 times lower than required, and 98 % of the incoming sediment settles in the canal. Using the minimum annual cost criterion, the optimal canal regime (36 m³/s in May-September and 32 m³/s in the other months) and the area of a settling basin upstream of the M-3-1 station (14,000 m²) were determined. The combined method reduces canal deposits by 74 % and annual costs by 2.61 billion sum (7.7 %), with a payback period of 1.1 years.